Update on the progress of our 42nd house

  • 14 November 2016
  • Author: Shelby Rust
  • Number of views: 936
  • 0 Comments
  • Foundation Poured
  • Footer and basement walls complete
  • Basement concrete floor complete
  • Joist and deck complete
  • Outside walls and upstairs framing complete
  • Preparing to install roof 
  • Inside stairs complete
  • Roof is covered
  • Windows installed
  • Outer doors installed
  • Walls painted
  • Flooring down
  • Doors being installed
  • Preparing for trim work
  • Installing cabinets
  • Then waiting on City Inspection